Missouri Metal Buildings

Missouri Metal Buildings: Costs, Permits and Farm Rules

Quick Answer: Missouri Metal Buildings

A 40x60 costs $16,800-$57,600 as a kit and $45,000-$123,900 installed. Missouri metal buildings follow local codes, because the state leaves adoption to counties and cities, so call your county before you order. Farm shops, machine sheds and hay barns lead in the north-central counties, and the Bootheel adds earthquake design. Pull your address from the ASCE Hazard Tool, then compare free quotes.

Simplify your research by letting us do the work for you.

Long gray steel machine shed with sliding doors in the Missouri River bottoms, a combine and grain cart parked on the tire-tracked gravel at harvest

Missouri farm country asks a lot of a building. Hay goes up in the summer, grain comes in at harvest and the equipment needs a roof that survives a spring storm line. A steel frame handles all three, and good planning keeps Missouri metal buildings toward the low end of their price range. This guide to Missouri metal buildings covers what a building costs by size, how the weather changes between the river bottoms and the Bootheel, and who issues the permit.

It is written for people building in north-central and west-central Missouri: Chariton, Carroll, Caldwell, Livingston, Ray, Lafayette and Saline counties, around Chillicothe, Carrollton, Marshall, Lexington, Richmond and Keytesville. Those are grain, hay and cattle counties east of Kansas City. The advice on Missouri metal buildings fits farm shops and machine sheds anywhere in the state. A free quote turns these ranges into a number for your own farm or lot.

$45K–$124KInstalled, 40x60
$16.8K–$57.6KKit only, 40x60
LocalWho adopts building codes
BootheelEarthquake zone, southeast corner

Get Up To 5 Free Quotes for Your Building

  • Enter your size and county once
  • Compare bids from several suppliers
  • Zero obligation
Compare Free Quotes

Tan steel shop beside grain bins and a dryer at harvest in Livingston County, a semi loading at the pit and a red pickup by the door

What Missouri Metal Buildings Cost by Size

Start with the building itself. The price of Missouri metal buildings has two layers. The kit means steel framing, wall and roof panels and trim, trucked to your farm lane. The installed figure also pays for concrete, the erection crew, grading and county permits. Every number below is a range, because ground, doors and finish differ from one Missouri parcel to the next.

SizeFloor areaKit onlyInstalledTypical use
30x401,200 sq ft$10,800-$38,400$25,800-$75,900Farm shop or hay storage
40x401,600 sq ft$11,200-$38,400$30,600-$85,500Heated shop or garage
40x602,400 sq ft$16,800-$57,600$45,000-$123,900Machine shed or repair shop
40x803,200 sq ft$22,400-$70,400$59,400-$155,900Combine and tractor storage
60x1006,000 sq ft$42,000-$132,000$109,800-$284,700Grain handling or commodity barn

Larger Missouri metal buildings cost less per square foot, because the frame, the engineering and the crew's travel spread across more floor. The 40x60 below shows how the lines stack up. Metal building prices uses the same method for other sizes.

Line for a 40x60LowHigh
Kit, materials only$16,800$57,600
Concrete slab, 4 inch$14,400$28,800
Erection crew$12,000$28,800
Site preparation$1,300$5,600
Permits$500$3,100
Installed total$45,000$123,900

That is roughly $19 to $52 per square foot installed at this size, a figure that answers the common search for a metal building cost per square foot. Overhead doors, insulation, wiring and an interior finish all cost more on top. Heating a shop with a mini-split adds $2,000-$9,200, and spray foam on the walls and roof is $1.00-$4.50 per square foot.

Cream steel welding and repair shop with a green roof and two overhead doors, a pipe trailer and service truck on the apron near Lexington

Why Two Farm Buildings of One Size Price Differently

Two neighbours in Livingston County can order the same 40x60 and receive very different bids. Where a quote lands between the low and high figure depends on five things about the property and the county.

The Cost Drivers That Matter Here

  • Wind and snow engineering: a design for a tornado-prone open field or a heavier snow load means stronger frames and stamped drawings.
  • Delivery distance: a gravel county road ten miles from the nearest town costs the truck more than a paved lot in Marshall.
  • Local labour: a crew that travels from Kansas City or Columbia charges for the drive, and metro crews charge more than rural ones.
  • Site work: a building on a river-bottom field needs more fill and drainage than one on a ridge.
  • Soil: clay that swells and shrinks can mean a thicker slab or deeper footings.

Steel against wood, kit against turnkey

Steel does not rot and insects ignore it, which matters in a damp hay barn. Buying a kit means you pay for materials and find your own crew. Turnkey hands the whole job to one contractor, which is easier when the farm is busy. Pole-barn builders sell a different wooden system, covered on pole barns versus metal buildings.

Brown steel gambrel hay barn in late winter, round bales half fed out beside it and a tractor with a bale spear in the snow

Weather From the River Bottoms to the Bootheel

Missouri weather is not one thing. Missouri metal buildings are designed to the site, not the state. Wind, snow and seismic values come from ASCE 7 and change from one address to the next. Every code figure on this page is drawn from published documents for orientation only, is not engineering advice, and must be confirmed with the building department that will review your plans and the engineer who seals them — Metal-Buildings.org is not responsible for design decisions made from these numbers. Pull your own address from the ASCE Hazard Tool before you order anything.

RegionWhat drives the designWhat to ask your engineer
North-central and west-central (Chillicothe, Carrollton, Marshall, Lexington)Severe thunderstorms, straight-line wind, tornadoes, winter snow and driftingWind speed, ground snow load and drift at your address
Kansas City and the Missouri River corridorThunderstorm outflow and tornado seasonRisk category and wind exposure
Ozarks (Springfield area)Storms, ice and rocky groundFooting depth over limestone
St. Louis and the Mississippi corridorStorms, plus distant earthquake shakingSeismic design category
Bootheel (New Madrid zone)Earthquake shaking, soft river soilsSeismic design category and soil report

Tornado wind is the item farm owners ask about first. Missouri sees dozens of tornadoes in a typical year. A pre-engineered building is designed to a wind speed for its location, not to survive a direct hit. Doors are the weak point in a storm, so ask for door ratings that match the wall design. The wind load calculator shows how the numbers work.

Snow is mild next to the northern plains but not absent. Drifts pile against a taller wall or a lean-to, and the engineer accounts for them at your address. In the Bootheel, the New Madrid Seismic Zone spans more than 100 miles and averages over 200 small earthquakes a year, according to the State Emergency Management Agency. Missouri's emergency managers say similar quakes to those of 1811 and 1812 still pose a risk today.

Price Your Building Today

  • Up to 5 competitive bids
  • Free and zero obligation
  • Compare quotes and decide
Start My Free Quotes

Olive green steel equipment and boat barn at the edge of the Chariton County wetlands at dawn, a johnboat and old pickup out front, geese overhead

Permits: Who Issues One and What a Farm Building Needs

Missouri leaves most code decisions to local government, so permits for Missouri metal buildings come from the county or the town. The International Code Council notes that although most relevant building codes are adopted locally, the state adopts codes for state-owned buildings. The state's own Department of Natural Resources says the codes in force are listed by county and city, and that the most current answer comes from the local jurisdiction. See the ICC adoption map for Missouri for the overview.

So the first call is to your county. Some counties have adopted the International codes, some adopt for the town only and some have no building code at all outside city limits. Missouri's county code statute lets first and second class counties adopt building regulations, and a county without a code before 2001 needs a vote of its people to start one. That is why a Carroll County farm and a Boone County shop can face different rules. Plan your Missouri metal buildings around the local answer.

QuestionWho answers it
Does the county adopt a building code?County commission or resource management office
Does the town inside the county adopt one?City hall or the town's building inspector
Is a farm building exempt?The county, in writing, before you pour concrete
Does the lender or insurer want plans?Your lender and your insurance agent

The county code statute I read has no farm exemption of its own. If one exists where you live, it is the county's rule, and these are normally tied to use: a building that is not used only for farming can lose it. Ask for the exemption in writing, ask about the electrical work and septic if you plan any, and keep the letter. A building with a lender behind it often needs sealed plans whether or not the county asks. See metal building permits and codes for the general picture, and the USDA Farm Service Agency if you are financing a farm building.

Gray steel horse barn with a black monitor roof on a foggy morning, two horses at the fence and a pickup with a horse trailer on the drive

Foundations, Frost and Soil

Frost depth is set by the jurisdiction, not by the state. The adopted residential code carries a table where each county or city fills in the minimum depth of a footing below grade, so there is no single Missouri number to quote. Ask the building department or your engineer for the value at your address, and never accept a guess from a forum.

North Missouri soils behave differently from the Ozarks. Heavy clay and silty river-bottom ground swell when wet and shrink when dry. Along the Missouri River, fill and drainage often matter more than the footing itself. In the Ozarks, shallow rock changes how deep you can dig. A soils report is cheap next to a cracked slab.

A slab on frost-protected footings

A heated building with a concrete stem wall puts the slab on a short frost wall that reaches below the local frost line. An unheated hay shed can sit on piers or a thickened edge. Both options are an engineer's call at your site.

Red steel cattle barn with an open lean-to over pipe pens and a chute, Black Angus cattle inside, one of the working Missouri metal buildings in Saline County

What People Build in Farm Country

Chariton, Carroll, Ray and the counties around them are grain, hay and cattle country. Missouri metal buildings there follow the work. Here is what they look like.

UseCommon sizeWhat to plan for
Farm shop40x60Tall door for a combine, insulated and heated, a slab with floor drains
Machine shed40x80 or largerClear span, wide doors and eave height for a planter or sprayer
Hay storage30x60 and upOpen or partly enclosed walls for airflow, a dry floor and a fire plan
Grain handling60x100Heavy floor loads and dust control
Livestock30x60 and upGalvanized rather than Galvalume panels, ventilation and a washable floor

Each of these has its own guide. Farm shop buildings and farm equipment storage buildings cover the first two. The metal hay barn guide covers hay, and metal livestock shelters covers cattle. Ammonia from animals attacks the aluminum in Galvalume, so a confinement building belongs in galvanized steel.

Farm buildings are also treated differently for tax. A general-purpose machine shed or farm shop is 20-year property, and a single-purpose livestock structure can qualify for faster treatment. Ask your tax adviser, because a building is not written off in the first year the way equipment can be.

Tan steel indoor riding arena with a row of slot windows near Sedalia, horse trailers and pickups lined up along the side wall

Delivery and Erection

Missouri metal buildings ship as a kit on flatbeds, usually in several weeks, and the truck needs a firm road to the pad. Farm lanes with soft shoulders or low bridges can add a day and a forklift. Ask how the supplier handles unloading, and where the crew stages the steel on a wet spring field.

Erection of Missouri metal buildings takes a crew of several people a few days for a 40x60 once the slab has cured. Crane work and tall eaves push the labour line up. If you plan to build it yourself, steel erection is dangerous work, and OSHA's steel erection rules set the minimum.

Do not skip the call before ordering

Order your Missouri metal buildings kit after the county confirms the permit rules. Frames are engineered to the loads of the site, and a change after the order costs money.

Gray steel landscaping contractor shop on the edge of Kansas City with three overhead doors, mulch bins, a skid steer and trucks with mower trailers

Kansas City, Columbia, Springfield and St. Louis

Four metros each get a short note on Missouri metal buildings.

Kansas City

Missouri metal buildings near Kansas City face a patchwork. The city and its suburbs are many building departments, each with its own adopted code. Wind and tornado exposure matter on the open ground east of the city.

Columbia

Around Columbia, ask the county whether it has adopted a building code; where it has, a shop goes through plans review. Farm ground is a question for the county.

Springfield

The Ozarks mean rock, slope and runoff. Ask your engineer about footings. Slopes shape Missouri metal buildings there.

St. Louis

St. Louis is in the shaking range of the New Madrid zone, so the seismic design category deserves a real look.

Weathered white steel warehouse with loading docks in Columbia, box trucks at the docks and pallets stacked beside a forklift

Green steel woodworking shop with a covered porch on an Ozarks ridge, firewood stacked along the wall, one of the Missouri metal buildings near Springfield in autumn

Cost Questions Missouri Buyers Type Into Bing

Missouri searchers ask the same short questions about Missouri metal buildings again and again. Here are plain answers, drawn from the same ranges as the tables above.

Steel building prices and installed prices

Steel buildings prices run $7 to $32 per square foot as a kit, depending on size. Installed, a 40x60 is $45,000-$123,900 and a 60x100 is $109,800-$284,700. The range is wide because the frame, doors and site work vary. The metal building cost estimator gives a range for your size.

A red iron shop, 60x100, with concrete and insulation, erected

Concrete and erection are already inside the installed figure of $109,800-$284,700. Insulation is extra. Spray foam runs $1.00 to $4.50 per square foot of surface, so a building this size adds a meaningful line. Red iron frames sit toward the upper half of the range. Red iron buildings explains the framing.

A heated 40x60 garage with a concrete stem wall

Start from $45,000-$123,900 installed for this kind of Missouri metal buildings project. A stem wall and a heated slab raise the concrete line, and a mini-split adds $2,000-$9,200. See the foundation section above for how the wall works.

Pre-engineered metal buildings in Missouri

A pre-engineered building arrives as a designed kit with sealed drawings. Most counties and lenders want them. Pre-engineered metal buildings explains what is in the package.

For a 40x40, expect $11,200-$38,400 as a kit and $30,600-$85,500 installed. For a 40x80, expect $22,400-$70,400 and $59,400-$155,900. Searchers also ask for the best company. This page names none, because the right supplier is the one whose bid fits your drawings.

Building across the state line

Looking beyond Missouri metal buildings? See find metal buildings by state for the full list, and Texas metal buildings or Ohio metal buildings for the nearest pages we have written.

Frequently Asked Questions

How much do Missouri metal buildings cost?

A 40x60 runs $16,800-$57,600 as a kit and $45,000-$123,900 installed. Per square foot, small buildings run dearer and big ones cheaper. Your own figure depends on wind or snow engineering, eave height and site work.

What would a 40x80 machine shed cost in Missouri?

A 40x80 has 3,200 square feet, enough for a combine and a tractor. Expect $22,400-$70,400 for the kit and $59,400-$155,900 installed.

What is the metal building cost per square foot in Missouri?

Installed, a 40x60 works out to roughly $19 to $52 per square foot. A big machine shed lands near the bottom of that span and a small garage near the top.

Is there a free metal building cost calculator?

Yes. The metal building cost estimator gives a range once you enter a size. For firm numbers on your parcel, the quote form returns bids from suppliers.

Do I need a permit for a metal building in Missouri?

Usually, but it depends on the county or town. Permits for Missouri metal buildings are local. Missouri leaves building codes to local government, so call the county first. Some counties exempt qualifying farm buildings, and you should get that in writing.

Does Missouri have a statewide building code?

Not for private buildings, so Missouri metal buildings follow local rules. The state adopts codes for state-owned buildings, and counties and cities adopt their own. Check whether yours does.

Is a farm building exempt from a permit in Missouri?

Not by one statewide rule. Any exemption is set by the county and usually depends on the building being used only for farming. Ask the county commission or resource office.

How deep does a footing need to be in Missouri?

Below the local frost depth, which each jurisdiction sets in its adopted code. Your building department or engineer can give the number for your address.

Can a metal building survive a tornado?

It is engineered to a wind speed for its location, which is not the same as surviving a direct hit. Ask for door ratings and anchorage that match the design.

Do earthquakes matter in the Bootheel?

Yes. The New Madrid zone sits in southeast Missouri, and the engineer sets the seismic design category for your site.

Kit or turnkey on a farm with family help?

A kit looks cheaper, but someone has to schedule the slab, the crane and the crew, and harvest can get in the way. Turnkey gives you one contractor to call.

Conclusion

Missouri rewards a phone call before a purchase order. Pull your hazard numbers, ask your county about its code and the farm exemption, and test the soil. Then your Missouri metal buildings project goes up on schedule.

The price you want for Missouri metal buildings is a quote for your parcel, not an average. One short form brings several bids for the same building, so you can compare like with like.