Quick Answer: 50x70 Metal Building
A 50x70 metal building gives you 3,500 square feet of clear-span floor, enough for eight pickups in two rows or a repair shop with a parts room and an office. The kit alone runs about $24,500 to $77,000 ($7 to $22 per square foot). Add the slab, erection, site preparation and permit and the installed total is about $64,800 to $169,700, or $18 to $49 per square foot. Those figures are for a 12 ft eave, the shortest wall in the table. Every extra foot of wall adds roughly 3% to the kit, and nearly every jurisdiction requires a permit.
Simplify your research by letting us do the work for you.

50x70 Metal Building: Cost, Doors and What Fits in 3,500 Sq Ft
A 50x70 metal building is a shop, not a shed. It runs 50 feet wide and 70 feet long, which comes to 3,500 square feet of open floor with no posts in the way. That is room for a fleet of trucks, a small warehouse with a forklift aisle, or a full repair bay with a parts room and an office tucked into one corner.
This page is for the buyer who has settled on a 50x70 metal building and wants the working numbers. It covers what fits inside, what the kit costs, what the slab, crew and permit add, and how to plan doors on a 50-foot end wall. Still choosing a footprint? The sections below link to the neighbouring sizes. Short on time? The tables are the answer.

What Fits Inside a 50x70 Metal Building
Start with the vehicles, because they set the layout. The site's vehicle fit planner sizes a standard pickup at about 19 feet long and 7 feet wide. It asks for 3 to 4 feet of clearance around each vehicle, with 2 feet as the minimum.
Across the 50-foot width, four pickups parked side by side take 28 feet. The other 22 feet splits into five gaps of more than 4 feet, so every door opens. Two such rows use 38 feet of the 70-foot length. That is eight trucks, and a 32-foot strip is still left for aisles, a bench wall and shelving.
Big rigs change the picture, so check them against the floor before you commit. The planner lists a 32-foot Class A motorhome at 8.5 feet wide and 11.5 feet tall. Two of them end to end take 64 of the 70 feet, which leaves only the 2-foot minimum clearance at each end and between them. Fine for storage. Tight for anyone who plans to walk around them.
A farm tractor at 15 feet long is no challenge, and a 35-foot fifth wheel fits with room to spare. The one thing a 50x70 metal building cannot do is hold a full tractor and trailer. The planner puts a 70-foot semi at an 80x100 minimum, because the rig is as long as this building before you add any clearance. If trucking is the goal, the semi truck shop page covers it, and the 50 x 80 metal building gains the extra 10 feet of length.

Setting Up the Space: Shop, Warehouse or Office
The planner's rules of thumb for a working shop are easy to total. A workbench area takes 100 to 200 square feet, parts storage 150 to 300, tool chests 50 to 100, and a compressor corner 50 to 75. Added together that is 350 to 675 square feet. In a 3,500 square foot building, that leaves most of the floor for the vehicles themselves.
How the 3,500 Square Feet Can Split
- Vehicle shop: two or three service bays, a parts room, a bench wall and a small office
- Fleet storage: eight pickups in two rows, or a pair of motorhomes end to end
- Small warehouse: shelving rows with a forklift aisle and a dock door on the end wall
- Farm shop: equipment on one side, a fabrication bench and storage on the other
- Mixed use: a 50 x 20 shop floor in the front, a storage run behind, an office in the corner
Racked storage cares about height more than footprint. Shelving that rises to 10 or 12 feet needs a tall eave and an aisle wide enough for the lift truck you plan to run, so ask the equipment maker for its turning space before you fix the layout. The forklift guide covers the machines, and the warehouse page covers the racking side.
A lift is a height question too. The post and the raised vehicle both have to clear the ceiling, and the lift maker publishes its own minimum, so take that number to the eave table below before you choose a wall height.
An office is the small addition that surprises people. It adds up fast. A corner room of 200 to 300 square feet is a minor part of 3,500, but it brings insulation, a mini-split, electrical and its own finish work. The next section prices what the contract allows. Plumbing has no reliable range, so it needs a plumber's quote.

What a 50x70 Metal Building Costs
The advertised price is almost always the kit alone: the steel frame, roof and wall panels and trim. It leaves out the slab, the crew, the site work and the permit. For 3,500 square feet the kit runs $24,500 to $77,000, or $7 to $22 per square foot. Here is the whole job, line by line.
| Cost Component | Range | Notes |
|---|---|---|
| Steel kit only | $24,500 – $77,000 | $7–$22/sq ft for 3,500 sq ft; frame, panels, trim |
| Concrete slab (4") | $21,000 – $42,000 | $6–$12/sq ft installed |
| Erection labor | $17,500 – $42,000 | $5–$12/sq ft; metro and coastal crews charge more |
| Site preparation | $1,300 – $5,600 | Total, depends on access and slope |
| Permit | $500 – $3,100 | Varies by jurisdiction |
| Installed total | $64,800 – $169,700 | Kit, slab, erection, site preparation and permit; about $18–$49/sq ft |
| Doors and windows | Quoted per opening | Not in the total above; sized to your use |
| Spray foam insulation | $1.00 – $4.50 per sq ft | Extra, priced by the area you cover |
The installed total is the five lines above it added together, low ends with low ends and high ends with high ends. Few jobs hit every high or every low at once. Most land between. A level lot, a plain frame and a rural crew sit near the bottom. Red iron, a thick slab, tall walls and a metro crew sit near the top.
At this size the slab and the crew are the big lines, not the steel. Together they run $38,500 to $84,000, more than the kit at its low end. Site preparation and the permit total only $1,800 to $8,700, which is a small share of a 3,500 square foot job. Small buildings feel those two lines far more.
50x70 metal building prices by eave height
Every price above is for a 12 ft eave, the shortest wall in the table for this width. Taller walls cost more, though not proportionally more. Each extra foot adds roughly 3% to the kit. The slab, site work and permit do not change with height, so the installed total climbs more slowly than the kit. The size is written width by length by eave: a 50x70x16 is 50 ft wide, 70 ft long, with 16 ft walls.
| Building | Tallest door | Kit | Installed |
|---|---|---|---|
| 50x70x12 | 10 ft | $24,500–$77,000 | $64,800–$169,700 |
| 50x70x14 | 12 ft | $26,000–$81,600 | $66,300–$174,300 |
| 50x70x16 | 14 ft | $27,400–$86,200 | $67,700–$178,900 |
| 50x70x18 | 16 ft | $28,900–$90,900 | $69,200–$183,600 |
| 50x70x20 | 18 ft | $30,400–$95,500 | $70,700–$188,200 |
| 50x70x22 | 20 ft | $31,900–$100,100 | $72,200–$192,800 |
| 50x70x24 | 22 ft | $33,300–$104,700 | $73,600–$197,400 |
The tallest door is about 2 ft below the eave. The header takes some of that height and the door's own track and mechanism take the rest. Crane work, tall eaves or a tight site can push erection to $15 to $18 a square foot, which is above the band in the cost table.
To price your own openings, set this size up in the 3D metal building designer and move the doors around before you ask for a quote.
Shop and Workspace Extras
A few items sit outside the installed total. A mini-split costs $2,000 to $9,200 and heats and cools an office or one zone, not a whole shop floor. Drywall runs $1.50 to $3.50 per square foot of wall. The published electrical range covers buildings of 250 to 1,500 square feet, so a shop this size sits above it and needs an electrician's quote.
Price Your 50x70 Before You Pour the Slab
Tell us the doors and eave height once. Trusted suppliers quote the same building so you can compare line for line.
- Up to 5 quotes, fast and easy
- Free, no-pressure comparison
- Zero obligation

Doors and Wall Height on a 50-Foot End Wall
Doors are where a big shop still gets planned wrong. Plan them first. Every opening needs steel beside it for framing, and a second tall door is its own line, quoted per opening. The 50-foot end wall gives you more room than a small garage, so the question is how many bays you want.
- Three 12 x 12 doors on the end wall: 36 feet of openings and 14 feet of wall left for framing. This is the three-bay shop layout.
- Two 14 x 14 doors: 28 feet of openings, 22 feet of wall, with room for a walk door between them. Built for a motorhome or a tall truck.
- One wide door plus a walk door: a single large opening for equipment, with the rest of the wall left plain.
- A row of doors on the 70-foot sidewall: more openings, and the vehicles park across the 50-foot depth.
Read the door against the eave table. A 12 ft eave gives a 10 ft door, a 14 ft eave gives a 12 ft door, and a 16 ft eave gives a 14 ft door. So the 12 x 12 doors above need a 14 ft eave, and the two 14 x 14 doors need a 16 ft eave. The table shows what each foot adds.
The planner suggests 12 feet of eave for lifted trucks, tractors and travel trailers, and 16 feet for Class A motorhomes and tall fifth wheels with roof air conditioners. Add 3 to 4 feet of clearance above the tallest equipment in operating position.
Door makers publish wind-rated and standard models, and the Door & Access Systems Manufacturers Association is the trade body that sets door standards. If your area has high design winds, ask for a wind-rated door.

Insulation, Gauge and Finish Choices
The kit's basic insulation is fine for dry storage. A heated shop, worked in all winter, needs more. Spray foam at $1.00 to $4.50 per square foot gives the most R-value per inch. Batts cost less but need more care at the seams.
Ask every supplier what square footage the insulation price is measured on. The shell is much bigger than its floor. The four walls alone, 240 feet around at a 12 ft eave, come to 2,880 square feet before the gable triangles and the roof are counted. Insulating that is a different job from insulating 3,500 square feet of floor.
R-value on the label is not the whole story. Steel girts and purlins carry heat straight past the insulation between them, which is called thermal bridging. That is why current energy codes call for a continuous layer over the framing as well. The minimum depends on your climate zone, and the DOE Building Energy Codes Program keeps the zone map.
Metal panels also sweat when humid indoor air meets a cold surface. The fix is a vapor retarder on the warm side of the insulation, enough insulation and some ventilation, not a different steel.
Panel gauge runs backward: the lower the number, the thicker the steel, so 12-gauge is heavier than 14-gauge. For coatings, Galvalume usually outlasts plain galvanized steel outdoors, except in a building that will house livestock. Ammonia attacks the aluminum in Galvalume, and galvanized holds up better there.

Foundation and Site Prep for 3,500 Square Feet
The slab is the biggest line after the steel. No kit price includes it. At $6 to $12 per square foot, a slab runs $21,000 to $42,000. Soil, thickness and reinforcement move it within that range.
The concrete itself is easy to estimate. A 4-inch slab over 3,500 square feet is about 1,167 cubic feet, or 43 cubic yards. At 6 inches it is 1,750 cubic feet, about 65 cubic yards. Thickened edges around the 240-foot perimeter add more, and the site's concrete slab calculator will run your exact numbers.
Footings have to go below the local frost line and sit on undisturbed soil, engineered fill or rock, per the International Building Code. Frost depth is set locally, so ask the building department instead of trusting a chart. A truck-heavy shop may want a thicker slab than a storage building, and the engineer decides that.
Site preparation runs $1,300 to $5,600. A flat, open lot sits at the bottom. A sloped lot that needs cut, fill and drainage sits at the top. The anchor bolts go in when the slab is poured, so the slab contractor needs the building drawings first.

Permits, Engineering and Erection
Plan on a permit for your 50x70 metal building. Fees run $500 to $3,100, and review can take weeks. A building this size is also judged by how you use it. A private shop, a business with customers and a workspace with employees can each fall under different occupancy, exit and fire rules, so say what the building is for when you call the building department.
Most jurisdictions want drawings stamped by an engineer licensed in your state. Those drawings use the wind, snow and seismic loads for your exact address. There is no single national figure, which is why two quotes for the same building can carry different steel. The ASCE Hazard Tool shows the loads for any address, and the Metal Building Manufacturers Association publishes the industry's design guidance. The permits and codes guide covers the process step by step.
A building this size is crew work. Frames this wide are heavy. The erection line runs $17,500 to $42,000. If you are comparing bids, ask each crew what lifting equipment it brings and who carries the insurance.
Steel Erection Can Hurt You
Raising frames and setting purlins means working at height with heavy, awkward steel. Falls and crushing are the real risks. Read OSHA's steel erection guidance before anyone climbs, and never skip fall protection to save an afternoon.
Compare Installed Prices on Your Shop
Get competing bids on the kit alone or on the finished building, slab and crew included, from suppliers who serve your area.
- Up to 5 competitive bids
- Suppliers who serve your area
- Compare quotes and decide on your schedule

Is This the Right Size? Nearby Footprints
A few feet in either direction changes what the building can do. The 50 x 60 metal building keeps the 50-foot end wall and door plan, but gives up 10 feet of length, or 500 square feet. That decides whether the second motorhome fits.
Going up, the 50 x 75 adds 5 feet of length, and the 50 x 80 adds 10 for a longer storage run behind the bays. If the width is the problem, not the length, the 40 x 75 trades 10 feet of width for 5 feet of length. Prices for each sit on its own page. Compare them with the numbers above.
A 50x70 metal building is the right call when the job is a fleet, a repair shop or a small warehouse, and the lot has room for 3,500 square feet plus a yard for turning. It is the wrong call for a single vehicle, or for a full-length trailer rig that needs the planner's 80x100.
Before You Request Quotes
- Measure your tallest and longest vehicle, mirrors and hitch included
- Decide how many bays you want and which wall they sit on
- Pick an eave height from the table: 12 ft for trucks, 14 to 16 ft for motorhomes and racking
- Ask the county about setbacks, height limits, use classification and the permit fee
- Decide whether you need power, insulation or both on day one

The Bottom Line on a 50x70
A 50x70 metal building earns its place by doing several jobs under one roof. It parks a fleet, runs a repair shop or stocks a small warehouse, with no columns to plan around. The kit runs $24,500 to $77,000, and a finished, permitted building lands between $64,800 and $169,700.
Settle the door plan and eave height first. They set the door and the price. Then get quotes that price the same building the same way, with kit and labor listed separately. That is how you spot the fair price quickly.

Frequently Asked Questions
A 50x70 metal building kit runs $24,500 to $77,000. Add the slab, erection, site preparation and permit and the installed total is $64,800 to $169,700, about $18 to $49 per square foot at a 12 ft eave. Doors, windows and insulation are extra.
It is 3,500 square feet of floor, 50 feet wide by 70 feet long. The roof is larger than the floor because of its pitch and any overhangs.
It means 50 ft wide, 70 ft long, with 16 ft walls. At 16 ft the kit runs about $27,400 to $86,200 and the installed total about $67,700 to $178,900. The tallest door under a 16 ft eave is about 14 ft. The slab, site work and permit cost the same as at a 12 ft eave.
For this width the first row is 12 ft, which gives a door of about 10 ft. Each extra foot of wall adds roughly 3% to the kit.
Eight standard pickups fit in this building in two rows of four, with more than 4 feet between them across the width. A strip of about 32 feet is left along the length for aisles and a bench wall.
No. The site's vehicle fit planner lists a 70-foot tractor and trailer at an 80x100 minimum, because the rig is as long as this building before any clearance is added.
The shell is the same $64,800 to $169,700 installed. A shop adds wiring, lighting and usually insulation. A mini-split for an office or one zone runs $2,000 to $9,200, and spray foam $1.00 to $4.50 per square foot of surface covered. Electrical needs an electrician's quote at this size.
On the 50-foot end wall, three 12 x 12 doors fit with 14 feet of wall left, and two 14 x 14 doors fit with 22 feet left. A 12 ft door needs a 14 ft eave, and a 14 ft door needs a 16 ft eave.
No. Kit prices cover the steel, panels and trim. The slab is poured separately and runs about $21,000 to $42,000 for 3,500 square feet, so ask each supplier whether the quote includes it.
Expect to. Almost every jurisdiction requires one for a building this size, and fees run $500 to $3,100. Check setbacks, height limits and use rules with your building department before ordering.
Related Resources
- 50x60 Metal Building: Sizes and Costs
- 50x75 Metal Building: Sizes and Costs
- 50x80 Metal Building: Sizes and Costs
- 40x75 Metal Building: Sizes and Costs
- Metal Building Prices: Complete Cost Guide
Ready to See What Your 50x70 Will Really Cost?
Send your door plan and eave height once, and let suppliers compete for the job.
- Up to 5 quotes from suppliers
- Free expert consultation
- Zero obligation, compare when ready