Quick Answer: 30×60 Metal Building Cost
A 30×60 metal building costs about $12,600–$43,200 for the kit, which is $7–$24 per square foot of its 1,800 square feet. With a slab, erection, site preparation and a permit, expect $34,200–$95,100 installed at a 12 ft eave. Each extra foot of eave adds roughly 3% to the kit. A 30 ft end wall takes two wide doors, and the 60 ft side wall takes four.
Simplify your research by letting us do the work for you.

A 30x60 gives you 1,800 square feet under one roof, and it is the size where a two-car garage turns into a real shop. This page works out the 30x60 metal building cost line by line, then shows what changes when the walls go higher.
It is written for anyone pricing a workshop, an equipment barn or a small commercial space. You will find the kit and installed ranges, the price by eave height, the doors that fit each wall, and how a 30 x 60 compares with the sizes next to it.
What Fits in 1,800 Square Feet

Thirty feet is a comfortable span. It is wide. It takes three car bays across with a little to spare, and the 60 ft length puts two vehicles deep in each. That is four to six cars, depending on how much walking room you want between them. Plan for the doors too.
A clear-span frame has no posts down the middle, so the whole floor is usable. A 30x60 metal building can hold a shop at one end and storage at the other, split by a partition wall you add later.
Common uses at 1,800 square feet
- A shop with two or three work bays and a wall of tool storage
- Contractor space for trucks, trailers and a parts room
- Farm equipment storage, with a drive-through lane
- An auto repair shop with a few service bays and an office
- A gym, studio or training space with room for a changing area
- Light manufacturing with a staging area for material
Laying out the floor
Most owners put the big doors on one 30 ft end and the support rooms on the other. Benches and shelving run down the 60 ft walls. For storage, doors on both ends let a tractor or trailer drive straight through.
A quick sizing check
Take the longest thing you will park, then add 3 ft on each side and 5 ft at the end. If that still fits inside 30 by 60, you have the room. If it does not, look at the 30x80 metal building.
30x60 Metal Building Cost, Line by Line

The price has two parts. Both matter. The kit is the steel frame, panels, trim and fasteners that arrive on a truck. The installed price adds everything it takes to stand the building on a slab and get it permitted.
At 1,800 square feet the kit is $7–$24 per square foot, or $12,600–$43,200. Installed, the five lines below add up to $34,200–$95,100. Each total is the sum of its lines. Short version: the 30x60 metal building costs about $19–$53 per square foot, installed.
| Line | How it is figured | Range for a 30x60 |
|---|---|---|
| Building kit | $7–$24 per sq ft | $12,600–$43,200 |
| Concrete slab, 4-inch | $6–$12 per sq ft | $10,800–$21,600 |
| Erection | $5–$12 per sq ft | $9,000–$21,600 |
| Site preparation | Total, varies by lot | $1,300–$5,600 |
| Permit | Total, varies by jurisdiction | $500–$3,100 |
| Installed total | Sum of the lines | $34,200–$95,100 |
These are national ranges. The low end is a plain building on a level lot with a rural crew. The high end is a heavy-load building on a tight site. Your own figure comes from quotes for your address, and the form on this page gets you several.
30x60 metal building prices by eave height
Every figure above is for a 12 ft eave, the shortest wall in the table. A lift, a loft or a tall truck needs more. Each extra foot of eave adds roughly 3% to the kit, while the slab, site work and permit do not change with height, so the installed total climbs more slowly.
The size is written width by length by eave. A 30x60x20 is 30 ft wide, 60 ft long, with 20 ft walls.
| Building | Tallest door | Kit | Installed |
|---|---|---|---|
| 30x60x12 | 10 ft | $12,600–$43,200 | $34,200–$95,100 |
| 30x60x14 | 12 ft | $13,400–$45,800 | $35,000–$97,700 |
| 30x60x16 | 14 ft | $14,100–$48,400 | $35,700–$100,300 |
| 30x60x18 | 16 ft | $14,900–$51,000 | $36,500–$102,900 |
| 30x60x20 | 18 ft | $15,600–$53,600 | $37,200–$105,500 |
| 30x60x22 | 20 ft | $16,400–$56,200 | $38,000–$108,100 |
| 30x60x24 | 22 ft | $17,100–$58,800 | $38,700–$110,700 |
The tallest door is about 2 ft below the eave, because the header and the door's own mechanism take that space. On the tallest walls, erection itself can run $15–$18 per square foot when a crane is needed. That is heavier than the band in the cost table, so ask for it by name.
If you already have a slab or are pouring it separately, the other four lines are what is left. For a 30x60 metal building that is the kit, erection, site preparation and the permit, which add up to $23,400–$73,500 before any concrete. Ask each bidder whether the slab is in their number, because a quote with no slab and a quote with one are not comparable.
What Moves the Price Up or Down

The kit spread from $12,600 to $43,200 is wide because several choices stack. Knowing them lets you steer toward the low end of the 30x60 metal building range without giving up what you need.
What pushes a kit toward the top of its range
- Red iron primary frames rather than a lighter truss frame.
- Taller eaves, at about 3% per foot.
- More and larger doors, each one framed and trimmed.
- Stamped drawings for heavy snow or a hurricane rating, which ran about 20% higher for the same size.
- Painted panels and factory insulation.
Wind and snow loads are set by your exact address, not by your state. The free ASCE hazard tool returns both for any street address, and your supplier builds the engineering around those numbers. That is why two kits with the same footprint can quote a long way apart.
Location matters too. Metro and coastal erection crews charge 25–40% more than rural ones. Northeast and California buyers should expect totals 30–50% above the national figure, and the South and Midwest tend to land 5–25% below it.
Compare Quotes for Your 30x60
Tell us where the building goes and how high you need the walls. You get up to 5 bids to compare side by side. One short form, free, zero obligation.
Get Free 30x60 QuotesUp to 5 quotes · Free · Zero obligation
Shop, Contractor and Farm Uses

The same 1,800 square feet serves very different owners. What changes is the layout, the doors and how much you spend on the inside.
Workshops and contractor space
In a 30x60 metal building, a working shop wants benches along both 60 ft walls and big doors on one end. The other end takes an office, a restroom and a parts room. Contractors tend to park trucks along one side, shelve inventory along the other and keep the middle for the work itself.
Plan the electrical early in any 30x60 metal building. Outlets and lighting are far cheaper to place before the walls are lined than after. Our 30x40 metal building guide covers the smaller version of the same layout.
Equipment storage and farm use
For tractors, implements and hay equipment, put doors on both 30 ft ends so machines drive straight through. Keep the floor simple. Farm machines need room to turn. Many farm owners add a bench and a small workshop area at one corner for repairs.
The USDA's agricultural building guidance is worth reading before you finalize a farm layout.
A 30x60 commercial building or finished shop starts from the same shell: $12,600–$43,200 for the kit and $34,200–$95,100 installed. What turns it into a finished space is the interior. Insulation, electrical and heating and cooling are priced in the sections below. A business use can also bring its own permits, such as an occupancy certificate, so call the building department before you order.
Doors, Wall Height and Options

Where the doors go changes how a 30x60 metal building works. The 30 ft end wall is the short one. Two 12 ft doors fit with room between them for a walk door, and one wide door suits a drive-through bay.
The 60 ft side wall has more room. Four 12 ft doors use 48 ft and leave 12 ft for framing and a walk door. Doors on the side let several bays open at once.
Quote doors by opening
A door price depends on its width, height, insulation and opener, so it is quoted per opening. Count your openings before you ask and every bid will be comparable.
Overhead doors also need room beyond the opening. Plan for roughly the door height plus 18 in of travel at the back, and about 3¾ in per side for the tracks. The exact figures depend on the door model.
Choosing a wall height
Match the eave to the tallest thing that must pass through the door. A 14 ft door needs a 16 ft eave, and an 18 ft door needs 20. Pick it first. You cannot change it later.
Roof style, steel gauge, windows, skylights and vents are other options, and each is priced by your supplier. Lower gauge numbers mean thicker steel, so a 26-gauge panel is thicker than a 29-gauge one, and nobody should judge a bid by the gauge alone.
Slab and Site Preparation

A 4-inch slab under a 30x60 metal building runs $6–$12 per square foot installed. At 1,800 square feet that is $10,800–$21,600, often the second-largest line after the kit. Thicker concrete or rebar for heavy equipment costs more, so tell the crew what will sit on it.
Site preparation is $1,300–$5,600 in total. A level, well-drained lot with truck access sits at the bottom. Grading, fill or a long driveway pushes it up.
Footings must reach below the local frost line, which ranges from about 12 in in southern states to 42 in or more in the north. Soil bearing is the engineer's call, and building on uncontrolled fill is not allowed. Site prep and the permit together are $1,800–$8,700 on any size, which is why a bigger building spreads that cost thinner.
Permits, Codes and Erection

Permits for a 30x60 metal building run $500–$3,100, depending on the jurisdiction. Almost every jurisdiction requires one, and most want drawings sealed by an engineer licensed in your state.
Codes come from the International Code Council, but each state and county adopts its own edition. Check which one applies before you order. The Metal Building Manufacturers Association publishes the design standards most suppliers build to, and the American Institute of Steel Construction covers the structural steel behind them.
Business uses can add their own permits, such as an occupancy certificate. Call the building department early. A design change after the permit is costly. Ask first.
Steel erection is a crew job
Raising a 30 ft span in a 30x60 metal building means lifting heavy frames and panels overhead. Read the OSHA steel erection rules before you decide who stands it. Erection runs $5–$12 per square foot, or $9,000–$21,600 here, and that cost buys a trained crew and the right equipment.
Price Your Shop or Storage Building
List the doors, the wall height and the finish you want, and suppliers quote it. Free, one short form, compare quotes and decide.
Request Up to 5 BidsFree expert consultation · Zero obligation
Insulation, Climate Control and Living Space

Bare steel in a 30x60 metal building sweats when warm, humid air meets a cold panel. Insulation and a vapor retarder on the warm side fix that. Most buildings used as a shop or a home need both.
Spray foam runs $1.00–$4.50 per square foot of surface. Energy codes also ask for continuous insulation over the framing, because steel conducts heat past the cavity layer. The DOE energy codes program shows the rules for your climate zone.
Adding a home to the shop
A 30x60 metal building has room for a shop and a small apartment. One layout gives the living side a 30x20 end of 600 square feet and leaves 1,200 square feet for the shop. The wall between them is a firewall in most codes.
Living space adds lines the shell price does not have.
- Electrical: $1,200–$7,100 for a small building of 250–1,500 square feet, so expect more for the full 1,800.
- HVAC with a mini-split: $2,000–$9,200.
- Drywall interior: $1.50–$3.50 per square foot.
- Plumbing: needs a plumber's quote.
Zoning decides whether anyone can live there at all. Our garage with living quarters guide covers layouts and what the codes ask for.
The kit and installed ranges on this page are for the bare shell, so an insulated 30x60 metal building costs more than those figures. Insulation is priced by the area of wall and roof it covers, not by floor area, which is why spray foam is quoted per square foot of surface at $1.00–$4.50. Ask your supplier to price insulation as its own line, so you can compare it between bids.
Choosing a 30x60 Over the Sizes Beside It

Most buyers weigh this size against the one below and the one above. The kit rate falls as the floor grows, so a bigger building costs less for each square foot.
The 30x40 is the smaller step at 1,200 square feet, with a kit of $10,800–$38,400. The 30x50 sits in between, and the 30x100 is the long version at 3,000 square feet, with a kit of $21,000–$72,000.
If you want a wider floor, the 40x60 adds 600 square feet at the same length. Pick the 30x60 metal building if you need a second bay and no more. Add length first. Length is cheaper than width.
The Bottom Line

The 30x60 metal building costs $34,200–$95,100 installed at a 12 ft eave. The kit alone is $12,600–$43,200. Taller walls add to the kit, and the slab, site work and permit stay put.
For a 30x60 metal building, decide on the eave height and the doors first. Then get quotes. The ranges here show what is normal, and the bids show what your site will cost. Compare at least three. Make sure each lists the same doors, wall height and drawings. That is the only fair test. Then decide.
Frequently Asked Questions
The kit runs about $12,600–$43,200, which is $7–$24 per square foot of floor. With a slab, erection, site preparation and a permit, the installed 30x60 metal building cost is about $34,200–$95,100, or $19–$53 per square foot.
A steel building and a metal building are the same thing. The kit is $12,600–$43,200 and the installed price is $34,200–$95,100 at a 12 ft eave. Your quotes will land inside that range, depending on your lot, your crew and your doors.
A 30x60x20 is 30 ft wide, 60 ft long, with 20 ft walls, tall enough for an 18 ft door. The kit is about $15,600–$53,600 and the installed total is about $37,200–$105,500. A 30x60x16 is $14,100–$48,400 for the kit and $35,700–$100,300 installed. The slab, site work and permit stay the same as at 12 ft.
A shop has the same 30x60 metal building cost as any other use: $12,600–$43,200 for the kit and $34,200–$95,100 installed. Insulation, power and a heater are extra, and you add them from the ranges in this guide.
Each extra foot of eave adds roughly 3% to the kit. Going from a 12 ft to a 16 ft eave moves the kit from $12,600–$43,200 to $14,100–$48,400, and the installed total from $34,200–$95,100 to $35,700–$100,300.
A 4-inch slab runs $6–$12 per square foot, which is $10,800–$21,600 for 1,800 square feet. Kit plus slab alone is $23,400–$64,800, before erection, site work and the permit.
Four to six full-size vehicles, parked in two rows with room to open the doors. Add a workbench or storage along one wall and it drops to three or four.
Thirty times sixty is 1,800 square feet. That is the floor area the kit and installed rates are figured on.
The erection band is $5–$12 per square foot, or $9,000–$21,600 for 1,800 square feet. Crane work or tall walls can reach $15–$18 per square foot. Metro and coastal crews charge 25–40% more than rural ones.
Almost certainly. Nearly every US jurisdiction requires one above a minimal size, and permits run about $500–$3,100. Ask your local building department which drawings it wants, since most want engineer-sealed plans.
Yes, where zoning and the local building department allow it. Living space needs a residential permit, insulation, a plumber's quote and a heating and cooling system. The garage with living quarters guide covers layouts.
Related Resources
- 30x40 Metal Building: Sizes and Costs
- 30x50 Metal Building: Sizes and Costs
- 30x100 Metal Building: Sizes and Costs
- Garage With Living Quarters: Layouts and Costs
- Metal Building Cost: Prices by Size & Per Square Foot
- 20x60 Metal Building: Sizes and Costs
Ready for Real 30x60 Numbers?
Send one short form and compare bids for your lot, your eave height and your doors. Free, with zero obligation.
Get Your Free QuotesUp to 5 competitive bids · Free expert consultation