A 20x24 metal building gives you 480 square feet of clear-span floor, the right size for one vehicle and a real workbench, or a tight two-car garage. The kit alone runs about $6,200 to $12,000 ($13 to $25 per square foot). Add the slab, erection, site preparation and permit and the installed total is about $13,300 to $32,300, or $27 to $68 per square foot. Those figures are for a 10 ft eave, the shortest wall in the table. Each extra foot of wall adds roughly 3% to the kit, and nearly every jurisdiction requires a permit.
Simplify your research by letting us do the work for you.

20 x 24 Metal Building: Cost, Doors and What Fits in 480 Sq Ft
A 20x24 metal building is the smallest size that still works as a real garage or shop. It runs 20 feet wide and 24 feet long, which comes to 480 square feet with no posts in the middle. That is room for a vehicle and a bench, or for storage that has outgrown the house, on a lot where anything larger would crowd the setbacks.
This page is for the buyer who has settled on a 20x24 metal building and wants the working numbers. It covers what fits inside, what the kit costs, what the slab, crew and permit add, and where the doors can go on a 20-foot end wall. Still comparing footprints? The 20 x 20 metal building page is the next size down.

What Fits Inside a 20x24 Metal Building
Start with the vehicle, because it sets everything else. The site's vehicle fit planner sizes a standard pickup at about 19 feet long and 7 feet wide. It advises 3 to 4 feet of clearance around each vehicle for walking room and open doors.
Park one pickup lengthwise and it takes 7 of the 20 feet of width. That leaves a strip 13 feet wide and 24 feet long beside it, enough for a bench, a tool chest and shelving. The catch is the length. A 19-foot truck in a 24-foot building leaves 5 feet to share between the door end and the back wall. It fits. It is not roomy.
How the 480 Square Feet Can Split
- One-car garage: one vehicle on one side, a 13 ft wide work strip along the other
- Small shop: the whole floor for benches, tools and material racks
- Tight two-car garage: two vehicles side by side, with very little room between them
- Storage building: aisles and shelving for mowers, ATVs and household overflow
Two vehicles are a different story. Two 7-foot-wide pickups use 14 feet of the 20-foot width. That leaves 6 feet to split across three gaps, about 2 feet each, which is less than the planner's 3 to 4 feet. The doors will open only part way. Narrower cars manage it better than trucks do.
The planner lists 20x30 with a 10 ft eave as the minimum for a standard pickup, so a 20x24 metal building sits just under that line. A lifted truck or large SUV has 24x30 as its minimum, and a 28-foot travel trailer needs 30x40. Neither one belongs here. If the pickup is the reason you are building, step up to the 20 x 30 metal building.

What a 20x24 Metal Building Costs
The price you see advertised is almost always the kit alone: the steel frame, roof and wall panels and trim. It leaves out the slab, the crew, the site work and the permit. For 480 square feet the kit runs $6,200 to $12,000, or $13 to $25 per square foot. Here is the whole job, line by line.
| Cost Component | Range | Notes |
|---|---|---|
| Steel kit only | $6,200 – $12,000 | $13–$25/sq ft for 480 sq ft; frame, panels, trim |
| Concrete slab (4") | $2,900 – $5,800 | $6–$12/sq ft installed |
| Erection labor | $2,400 – $5,800 | $5–$12/sq ft; metro and coastal crews charge more |
| Site preparation | $1,300 – $5,600 | Total, depends on access and slope |
| Permit | $500 – $3,100 | Varies by jurisdiction |
| Installed total | $13,300 – $32,300 | Kit, slab, erection, site preparation and permit; about $27–$68/sq ft |
| Doors and windows | Quoted per opening | Not in the total above; sized to your use |
| Spray foam insulation | $1.00 – $4.50 per sq ft | Extra, priced by the area you cover |
The installed total is the five lines above it added together, low ends with low ends and high ends with high ends. Few jobs on a 20x24 metal building hit every high or every low at once, so most land in between. A kit on a level lot with a rural crew sits near the bottom. A heavier frame, a thick slab, tall walls and a metro crew sit near the top.
Small buildings cost more per square foot than big ones. Site preparation and the permit do not shrink with the floor area, so on a 20x24 metal building they weigh more. That is why the installed range here is $27 to $68 per square foot while the kit alone is $13 to $25.
20x24 metal building prices by eave height
Every price above is for a 10 ft eave, the shortest wall in the table. Taller walls cost more, but not proportionally more. Each extra foot adds roughly 3% to the kit. The slab, site work and permit do not change with height, so the installed total climbs more slowly than the kit. The size is written width by length by eave: a 20x24x12 is 20 ft wide, 24 ft long, with 12 ft walls.
| Building | Tallest door | Kit | Installed |
|---|---|---|---|
| 20x24x10 | 8 ft | $6,200–$12,000 | $13,300–$32,300 |
| 20x24x12 | 10 ft | $6,600–$12,700 | $13,700–$33,000 |
| 20x24x14 | 12 ft | $6,900–$13,400 | $14,000–$33,700 |
| 20x24x16 | 14 ft | $7,300–$14,200 | $14,400–$34,500 |
The tallest door is about 2 ft below the eave. The header takes some of that height and the door's own track takes the rest. To see your own openings in place, set this size up in the 3D designer at 20 x 24 and move the doors around before you ask for a quote.

Shop, Power and Heat Extras
A few items sit outside the installed total, and most buyers want at least one. Electrical for a small building of 250 to 1,500 square feet runs $1,200 to $7,100, and 480 square feet falls inside that band. A mini-split costs $2,000 to $9,200. It heats and cools an office or one zone, which suits a building this small. Drywall runs $1.50 to $3.50 per square foot of wall. Plumbing has no reliable range, so get a plumber's quote.
Price Your 20x24 Before You Pour the Slab
Send the door plan and eave height once. Suppliers quote the same building, so you can compare line for line.
- Up to 5 quotes, fast and easy
- Free, no-pressure comparison
- Zero obligation

Doors and Wall Height on a 20-Foot End Wall
Doors are where small buildings get planned wrong. Plan them first. The end wall of a 20x24 metal building is only 20 feet wide, and every opening has to leave steel beside it for framing. Each overhead door is its own line, quoted per opening.
- One 9 x 8 door plus a walk door: the planner's pick for standard cars and small trucks. It leaves over 10 feet of wall beside the opening.
- One 10 x 10 door plus a walk door: the shop layout, with a taller opening for a lifted truck or a tractor.
- One 16-foot double door: a wide opening for loading, with only 4 feet of wall left for framing and a walk door.
Two 9-foot doors do not work on this wall. They would use 18 of the 20 feet and leave 2 feet to frame three jambs. Put a second opening on the 24-foot sidewall instead, and confirm the framing with the engineer.
Mind what parks behind a sidewall door. A vehicle driven in across the building has 20 feet of depth, and a 19-foot truck uses nearly all of it. Sidewall doors suit a mower, a cart or a workbench, not a pickup.
The planner pairs a 9 x 8 door with standard cars and 10 x 10 with lifted trucks. Read that against the eave table. A 10 ft eave gives an 8 ft door, and a 12 ft eave gives a 10 ft door. So a 10 x 10 door needs a 12 ft eave, and the table shows what that adds.

Insulation, Gauge and Finish Choices
The kit's basic insulation is fine for dry storage. A garage you heat, or a shop you work in all winter, needs more. Spray foam at $1.00 to $4.50 per square foot gives the most R-value per inch. Batts cost less but need more care at the seams.
Ask every supplier what square footage the insulation price is measured on. The shell of a 20x24 metal building is much bigger than its floor. With a 10-foot eave and a 3:12 roof pitch, the four walls and two gable triangles come to about 930 square feet, and the roof adds about 495 more. That is close to 1,400 square feet of surface around 480 square feet of floor.
Steel girts and purlins carry heat straight past the insulation between them, which is called thermal bridging. A continuous layer over the framing is the usual answer. The minimum depends on your climate zone, so ask the building department which energy code applies.
Metal panels also sweat when humid indoor air meets a cold surface. The fix is a vapor retarder on the warm side of the insulation, enough insulation and some ventilation, not a different steel.
Panel gauge runs backward: the lower the number, the thicker the steel, so 12-gauge is heavier than 14-gauge. For coatings, Galvalume usually outlasts plain galvanized steel outdoors, except in a building that will house livestock. Ammonia attacks the aluminum in Galvalume, and galvanized holds up better there.

Foundation and Site Prep for 480 Square Feet
The slab is the line buyers forget most often. No kit price includes it. At $6 to $12 per square foot, a slab for a 20x24 metal building runs $2,900 to $5,800. Soil and thickness move it within that range.
The concrete itself is easy to estimate. A 4-inch slab over 480 square feet is 160 cubic feet, or about 5.9 cubic yards. At 6 inches it is 240 cubic feet, about 8.9 cubic yards. Thickened edges around the 88-foot perimeter add more, and the site's concrete slab calculator will run your exact numbers.
Footings must sit on undisturbed soil or engineered fill and below the local frost line. Frost depth is set locally, and codes from the International Code Council leave the final number to the building department. Ask them instead of trusting a chart.
Site preparation is the widest line in the cost table, at $1,300 to $5,600. A flat, open lawn sits at the bottom. A sloped lot that needs cut, fill and drainage sits at the top. The anchor bolts go in when the slab is poured, so the slab contractor needs the building drawings first.

Permits, Engineering and Erection
Plan on a permit for your 20x24 metal building. Fees run $500 to $3,100, and review can take anywhere from two weeks to three months. Rural areas generally have simpler permitting than cities. Size thresholds and exemptions are set locally, so call the building department before you order anything.
Most jurisdictions want drawings stamped by an engineer licensed in your state. Those drawings use the wind, snow and seismic loads for your exact address. There is no single national figure, which is why two quotes for the same building can carry different steel. The Metal Building Manufacturers Association publishes the industry's design guidance. The site's permits and codes guide covers the process step by step.
Erection labor runs $2,400 to $5,800, which is $5 to $12 per square foot. Small as the shell is, raising steel takes skill and several people. Handle it as a trade job unless you have real experience.
Steel Erection Can Hurt You
Raising frames and setting purlins means working at height with heavy, awkward steel. Falls and crushing are the real risks. Read OSHA's steel erection guidance before anyone starts, rent proper lifting equipment, and never skip fall protection to save an afternoon.
Compare Installed Prices on Your Garage
Get competing bids on the kit alone or on the finished building, slab and crew included, from suppliers who serve your area.
- Up to 5 competitive bids
- Suppliers who serve your area
- Compare quotes and decide on your schedule

Is This the Right Size? Nearby Footprints
A few feet in either direction changes what the building can do. The 20 x 20 metal building is 400 square feet and keeps the same 20-foot width, but a pickup then has almost no room to spare. The 24 x 24 adds 4 feet of width, so two vehicles side by side have 10 feet to share instead of 6.
Going longer, the 20 x 30 keeps the end wall and door plan and adds 6 feet of length, which is what the planner asks for a standard pickup. The prices for each sit on its own page.
A 20x24 metal building is the right call when the job is one vehicle and a bench, the lot is tight, and the budget has to stay small. It is the wrong call for two trucks, a camper, a boat on a trailer or a vehicle lift.
Before You Request Quotes
- Measure your longest and widest vehicle, mirrors and hitch included
- Decide on end-wall or sidewall doors, and their sizes
- Pick an eave height from the table: 10 ft for cars, 12 ft for taller trucks and tractors
- Ask the county about setbacks, height limits and the permit fee
- Decide whether you need power, insulation or both on day one

The Bottom Line on a 20x24
A 20x24 metal building does one job well. It puts a vehicle and a working bench under steel without the slab and the steel of a larger building. The kit runs $6,200 to $12,000, and a finished, permitted building lands between $13,300 and $32,300.
Settle the door plan and eave height first. They set the door and the price. Then get quotes that price the same building the same way, kit and labor listed separately. That is how you spot a fair number fast.

Frequently Asked Questions
A 20x24 metal building kit runs $6,200 to $12,000. Add the slab, erection, site preparation and permit and the installed total is $13,300 to $32,300, about $27 to $68 per square foot at a 10 ft eave. Doors, windows and insulation are extra.
The shell of a 20x24 metal building is the same $13,300 to $32,300 installed. A shop adds wiring, lighting and usually insulation. Electrical for a small building runs $1,200 to $7,100, a mini-split for an office or one zone $2,000 to $9,200, and spray foam $1.00 to $4.50 per square foot of surface covered.
It means 20 ft wide, 24 ft long, with 12 ft walls. At 12 ft the kit runs about $6,600 to $12,700 and the installed total about $13,700 to $33,000. The tallest door under a 12 ft eave is about 10 ft. The slab, site work and permit cost the same as at a 10 ft eave.
It is 480 square feet of floor, 20 feet wide by 24 feet long. The roof is larger than the floor because of its pitch and any overhangs.
Yes, but tightly. The site's vehicle fit planner sizes a standard pickup at about 19 feet long and 7 feet wide, so it leaves 5 feet of the 24-foot length. The planner lists 20x30 as the minimum building for one.
Narrow cars can, but there is little room. Two 7-foot-wide vehicles use 14 of the 20 feet and leave about 2 feet in each gap. A 24x24 gives them 10 feet to share.
On the 20-foot end wall, one 9 x 8 door with a walk door is the usual choice for cars and small trucks. A 10 x 10 door suits a taller truck and needs a 12 ft eave. Two 9-foot doors leave too little wall for framing.
No. Kit prices cover the steel, panels and trim. The slab is poured separately and runs about $2,900 to $5,800 for 480 square feet, so ask each supplier whether the quote includes it.
Expect to. Almost every jurisdiction requires one for a building this size, and fees run $500 to $3,100. Check setbacks and height limits with your building department before ordering.
No. The site's vehicle fit planner lists a 28-foot travel trailer at a 30x40 minimum, which is longer and wider than this building.
Related Resources
- 20x20 Metal Building: Sizes and Costs
- 24x24 Metal Building: Sizes and Costs
- 20x30 Metal Building: Sizes and Costs
- 2 Car Garage: Sizes and Costs
- Metal Building Prices: Complete Cost Guide
- 25x25 Metal Building: Sizes and Costs
Ready to See What Your 20x24 Will Really Cost?
Send your door plan and eave height once, and let suppliers compete for the job.
- Up to 5 quotes from suppliers
- Free expert consultation