Quick Answer: 2 Story Metal Building
A 2 story metal building is a steel shell with walls of about 18 to 24 ft and a second floor or loft framed inside. A 30x40 at a 20 ft eave has a kit of about $14,000 to $49,900 and an installed total of about $29,000 to $87,400. A 30x50 is $35,800 to $107,100 installed, and a 40x60 is $49,000 to $137,700. The second floor is not in those figures and is quoted separately. A living space upstairs also means a residential review, so expect a permit.
Simplify your research by letting us do the work for you.

2 Story Metal Building: Sizes, Cost and Uses
A 2 story metal building is a steel shell with a floor inside it. The walls run taller than a normal shop, usually 18 to 24 feet, and a second level is framed in at the height of the first. That second level can cover the whole footprint or only part of it, and it can hold a bedroom suite, an office, a parts loft or plain storage.
This page is for the buyer weighing a 2 story metal building against a bigger single-level one. It shows three worked examples at a 20 ft eave, explains what the numbers leave out, and walks through the uses, stairs, windows and permit questions that come with a second floor. Still comparing footprints? Browse the metal building sizes first.

What Makes a Steel Building Two Stories
Two things. The sidewalls are tall enough for two levels, and a floor is framed inside the shell. The steel frame and panels are the same family as any other kit, only taller.
The floor is the part that changes the job. It can be a full second floor across the whole footprint. It can also be a loft or mezzanine over one end, which leaves the rest of the building open to the roof. A loft over a third of a garage is a very different project from a full floor over a shop, and the two get different prices.
Plan for about 8 ft of clear height on each level. The floor structure takes a foot or more between them, and the roof slopes up above the eave. That is why a 20 ft eave is the working height for most buildings of this kind. Lower than 18 ft and the upper level is a crawl space. The price tables below stop at 20 ft because that is the row this page prices.

Footprints That Suit a Second Floor
The footprint sets the floor area upstairs. A full second floor doubles the usable space, so a 30x40 holds 1,200 square feet on the ground and another 1,200 above it. A loft over half the building adds 600. Floor area is the simple part. The harder part is the stair, which eats a slice of whichever level it climbs from.
Most buyers land on one of three footprints. The 30 x 40 metal building is the compact option, wide enough for two bays and a stair at one end. The 30 x 50 adds 10 ft of length for a longer shop or a bigger apartment above it. The 40 x 60 is a small warehouse with room for offices on the upper level.
Narrow footprints work too, but the stair then uses a larger share of the floor. Anything under about 24 ft wide gets tight once a hallway is added. A good test is to sketch the stair, the upstairs hall and one room on a scale drawing before you order.

What a Two-Story Metal Building Costs
The table below prices the steel shell of a 2 story metal building for each of the three footprints at a 20 ft eave. The kit is the frame, panels and trim. The installed figure adds the slab, erection, site preparation and permit. The second floor is not in any of these figures. Joists, decking, stairs, railings and the structural changes that carry a floor are quoted on top.
| Building | Eave | Kit | Installed |
|---|---|---|---|
| 30x40 (1,200 sq ft footprint) | 20 ft | $14,000–$49,900 | $29,000–$87,400 |
| 30x50 (1,500 sq ft footprint) | 20 ft | $17,500–$62,400 | $35,800–$107,100 |
| 40x60 (2,400 sq ft footprint) | 20 ft | $20,800–$71,400 | $49,000–$137,700 |
These are ranges, and the width of each one is real. Soil, frost depth, crew rates and the engineering loads for your address all move the number. The slab is poured once, under the footprint, so a second floor does not double it. It may need to be thicker or have heavier footings if walls or columns carry the upper level. Ask for that in writing.
The second-floor or mezzanine price depends on the span, the load rating, the deck and the stair. It is quoted separately with the building, and this page gives no figure for it rather than guess. Ask each quote to list the floor as its own line.
30x40 prices by eave height
The first row is the usual starting wall. Each extra foot adds about 3% to the kit. The slab, site work and permit do not change with height, so the installed total climbs more slowly than the kit. The size is written width by length by eave: a 30x40x20 is 30 ft wide, 40 ft long, with 20 ft walls.
| Building | Tallest door | Kit | Installed |
|---|---|---|---|
| 30x40x10 | 8 ft | $10,800–$38,400 | $25,800–$75,900 |
| 30x40x12 | 10 ft | $11,400–$40,700 | $26,400–$78,200 |
| 30x40x14 | 12 ft | $12,100–$43,000 | $27,100–$80,500 |
| 30x40x16 | 14 ft | $12,700–$45,300 | $27,700–$82,800 |
| 30x40x18 | 16 ft | $13,400–$47,600 | $28,400–$85,100 |
| 30x40x20 | 18 ft | $14,000–$49,900 | $29,000–$87,400 |
The tallest door is about 2 ft below the eave. A building with a loft over the back half can still take a tall door at the front, which is useful if the lower level holds a truck, a tractor or a lifted vehicle. To try a shape, open the 3D designer at 30 x 40 and set the eave height before you ask for quotes. More on the base numbers is in the metal building prices guide.
Price the Shell and the Floor Together
Give the footprint, the eave height and whether the second level is a full floor or a loft. Suppliers quote the same building so the floor shows as its own line.
- Up to 5 quotes, fast and easy
- Free, no-pressure comparison
- Zero obligation

2 Story Metal Building Uses: Living Quarters, Offices and Lofts
Three uses cover most of what gets built as a 2 story metal building, and each one puts different demands on the floor.
- Shop or garage below, living quarters above. The ground floor holds vehicles and a workbench, and the upper level holds a bedroom, bath and kitchen. This is the most common reason to build up. The garage with living quarters and shop house pages go through it in detail.
- Office over a warehouse. A raised office gives a view of the floor below and frees ground space for racking. It needs a stair, an accessible route in many jurisdictions and a plan for heating a room above a cold space.
- A loft over part of a garage. Storage or a hobby room over one end, open on one side. This is the lightest version, and the metal building with loft page covers it.
The choice drives the cost more than the footprint does. A bedroom suite needs plumbing, a heated envelope and fire protection. A storage loft needs a strong deck and a guardrail. Decide which one it is before you compare quotes.

Stairs, Floor Loads and Fire Separation
Three items turn a tall shed into a code-reviewed 2 story metal building.
Stairs. The stair takes floor area on both levels and has to meet rise, run and handrail rules. Residential stairs and commercial stairs are held to different standards, which is one reason a living-quarters plan is reviewed differently from a storage loft. The adopted code is published by the International Code Council, and your building department decides which edition applies.
Floor loads. A floor that holds a bed and a couch is designed for less than one that holds pallets or a car lift. The load rating is chosen at the start because it sets the joist size and the columns underneath. It is hard to fix later.
Fire separation. Where people sleep above a garage or shop, codes generally call for a fire-rated separation between the two uses, plus smoke and carbon monoxide alarms. The details depend on the occupancy, so take the plan to the building department early.

Windows and Escape Openings for Upstairs Rooms
A bedroom needs a way out. Residential codes require every sleeping room to have an emergency escape and rescue opening, and the code sets the minimum clear size and the maximum height of the sill. A second-floor window meets that rule only if a person can climb through it, so the opening is sized and placed before the wall panels are ordered.
That matters on a steel wall. Openings are framed into the girts, and moving one after the building is up costs time. Choose window sizes and positions from the code requirements for the local jurisdiction, then confirm them on the stamped drawings.
Windows also change how the building looks. A row of upper windows tells passers-by it is a living space. Without them, a 2 story metal building reads as a tall shop, which may be what you want on a rural lot.

Insulating the Shell and Both Floors
Insulation is where the finish-out money goes. Spray foam runs $1.00 to $4.50 per square foot of surface covered, and drywall runs $1.50 to $3.50 per square foot. A building 20 ft tall has far more wall than floor, so insulation priced per square foot of floor misleads. Ask every supplier what area the insulation price is measured on.
Steel framing carries heat past the insulation between the members, called thermal bridging. Current energy codes call for a continuous layer over the frame as well, and the minimum depends on your climate zone. The DOE Building Energy Codes Program keeps the zone map. A lived-in upper level needs a vapor retarder on the warm side too, because steel panels sweat when humid indoor air meets a cold surface.
Electrical for a small building of 250 to 1,500 square feet runs $1,200 to $7,100. A 2 story metal building usually passes that size, so expect more. A mini-split costs $2,000 to $9,200 and conditions one zone or one floor. Plumbing has no reliable range, so it needs a plumber's quote. The insulation calculator runs your own surface area.

Foundation, Frame and Erection
Columns and walls that carry an upper floor put more load on the footings than a single-level shell does. Footings go below the local frost line and sit on undisturbed soil, engineered fill or rock. Frost depth is set locally, so ask the building department. The concrete slab calculator runs the yardage for your footprint.
The frame is the same pre-engineered type as any other. Designers add the floor loads when they size the rafters and columns, which is why the floor is described to the engineer before the order goes in. The Metal Building Manufacturers Association publishes industry design guidance.
Erection at 20 ft walls is crane work. That is not a weekend project for helpers and ladders, so plan for a crew.

Permits and Residential Review
Plan on a permit for a 2 story metal building. A building with people living upstairs is reviewed as a dwelling space, not as a storage shed, and that review looks at the stair, the escape openings, the fire separation, the heating and the plumbing. Fees and timelines are set locally, and the permit line in the tables above is a range because of it. Size thresholds and exemptions come from the local jurisdiction, so call the building department before ordering.
Most jurisdictions want drawings stamped by an engineer licensed in your state. The loads come from your exact address, and the free ASCE Hazard Tool shows them. The permits and codes guide covers the process step by step.
Zoning is a separate question. Some places limit height or forbid a dwelling in an accessory building. Ask both questions at once.
Compare Installed Prices for a 2 Story Metal Building
Get competing bids on the shell, the slab and the crew, with the second floor listed as its own line.
- Up to 5 competitive bids
- Suppliers who serve your area
- Compare quotes and decide on your schedule

Full Floor or Loft: Choosing Which
A full floor in a 2 story metal building doubles the usable area and fits a real apartment or a large office. It also asks the most of the frame, the stair and the permit review. A loft is cheaper to frame and lets the lower level keep a tall ceiling, which a truck, a lift or an RV garage needs. If the ground floor must stay tall, the loft is usually the answer. Work out what the lower level needs first, using the vehicle fit planner.
If the goal is a home with a shop beside it, the metal building homes page may be the better start. A 2 story metal building with a small apartment above is a different project from a house, and the permit path differs.
Before You Request Quotes
- Decide on a full floor, a loft over part, or a shop that may get a floor later
- Write down what the upper level holds, since that sets the floor load
- Pick an eave height from the table: 18 to 20 ft for two levels
- Ask the county about height limits, setbacks and living space in a 2 story metal building
- Ask each supplier to list the floor, stairs and finish-out as separate lines
The Bottom Line on a Two-Level Steel Building
A 2 story metal building makes sense when land is tight, or when one roof should cover a shop below and a space to live or work above. The shell prices out at $14,000 to $49,900 for a 30x40 kit at a 20 ft eave, and $29,000 to $87,400 installed. The second floor comes on top as its own quote.
Settle the layout first, then the eave height. Then get quotes that price the shell and the floor on separate lines. That is how you see what the second level actually adds.
Frequently Asked Questions
A 30x40 shell at a 20 ft eave runs $14,000 to $49,900 for the kit and $29,000 to $87,400 installed. A 30x50 is $35,800 to $107,100 installed, and a 40x60 is $49,000 to $137,700. The second floor is quoted separately and is not in those figures.
The sidewalls usually run 18 to 24 ft, enough for two levels of about 8 ft each plus the floor structure between them. The ridge sits higher than the eave.
It is quoted separately, because the span, the load rating, the deck and the stair all change it. Ask each supplier to list the floor as its own line, and get the figure in writing.
Often, yes, where zoning allows a dwelling in that building. The upstairs is then reviewed as living space, with stairs, escape windows, fire separation, insulation and plumbing checked by the building department.
A loft covers part of the footprint and leaves the rest open to the roof. A full floor covers all of it. The loft keeps a tall ceiling below, and the full floor doubles the usable area.
Expect to. A 2 story metal building with living space upstairs gets a residential review on top of the structural one, and the engineer's stamped drawings are usually required. Call the building department before ordering.
It can. The slab is still poured under the footprint, so it does not double, but columns and walls that carry the upper floor may need heavier footings. Ask for it as a line in the quote.
A 30x40 is the compact choice, with two bays and a stair at one end. A 30x50 gives a longer shop or a bigger apartment above, and a 40x60 suits a small warehouse with offices on the upper level.
Yes. Residential codes require an emergency escape and rescue opening in every sleeping room, with a minimum clear size and a maximum sill height. Size and place it before the walls are ordered.
Related Resources
- Garage With Living Quarters: Layouts and Costs
- Shop House: Living Space With a Workshop
- Metal Building With Loft: Options and Costs
- Metal Building Permits and Codes
- Metal Building Prices: Complete Cost Guide
Ready to See What Your 2 Story Metal Building Will Cost?
Send the footprint, eave height and floor plan once, and let suppliers compete for the job.
- Up to 5 quotes from suppliers
- Free expert consultation
- Zero obligation, compare when ready